Aeration Tank - Inlet and Outlet Structure1. Inlet and Outlet Structurea). Arrangement of influent distributionPipe and inlet as Figure, each tank capable of independent operation through valve control, Inlet channel 2.5 � 2.5' along tank width. b). Arrangement of outlet structureEach tank can be drained to expected level by draining pipes arrangement for acclimatization(in initial operation time) and maintenance(during routine operation). Width d = 16' 4 effluent trough 2.5 � 2.5', 4 effluent boxes with 2.5 � 2.5' � 3 use flat weir. c). Headloss from inlet to outletD h � 1 ft, estimation by experience or you can calculate D h with hydraulic equations. | Previous Page | Main Page | Next Page|
|