Design Criteria
To remove 55% of suspended solid and 30% of BOD5 of
influent water
At Qp, the square overflow rate, SOR=1500 gal/ft2.day
for each tank, check SOR at QA
Detention time DT=2.0 hr based on QA
Submerged orifice for inlet
V-notch outlet weir
Weir width=25'
For a well-designed and operated basin,
the typical removal of suspended solids and BOD5 from
municipal waster water as a function of overflow rate is given in Figure
11.
Figure 11
Note:1 m3/m2.day=24.5424
gallon/ft2.day
Figure 12 shows the removal of suspended
solids and BOD5 with respect to detention time in
primary clarifiers.
Figure 12
(1) Waste Water Treatment Plants, Syed R. Qasim, p268.
(2) "The Committee of Great Lakes--Upper Mississippi River Board
of State Sanitary Engineers (Ten States), Recommended Standards for Sewage
Water, Health Education Service, Albany, New York, 1978.